B-Eastski
New member
- Joined
- Dec 10, 2024
- Messages
- 25
- Points
- 3
Okay a rebuild is probably what is needed which would be for two HSQs 4-8 million alone. Stratton is rebuilding American Express costing 4 million. 1 lift.Again, what upgrades are needed? HSQ’s cover all the terrain. The Sherburne likely needs a rebuild but lifts are not really an issue. They have more capacity than currently needed.