I presume that crews dropped it when there was a "mechanical failure" during work yesterday. Looks like one of the cranes failed. The new red cabin is apparently damaged "beyond repair". Fortunately there were no injuries.
A new cabin will take months to make as each one is a custom job. Options going forward are running the blue one alone or doing something else. I wonder if they will reuse the red cabin one more season.
liftblog.com
www.fox13now.com
A new cabin will take months to make as each one is a custom job. Options going forward are running the blue one alone or doing something else. I wonder if they will reuse the red cabin one more season.
![liftblog.com](https://liftblog.com/wp-content/uploads/2022/03/new-tram_mockup_summer_people_red.jpg?w=1200)
New Snowbird Tram Cabin Damaged During Installation
One of the new cabins being installed on Snowbird’s Aerial Tram fell Saturday during installation, causing significant damage. Thankfully the incident occurred in a closed construction area a…
![liftblog.com](https://liftblog.com/wp-content/uploads/2018/08/cropped-12439395_1109134202451249_2003942850672291846_n.png?w=32)
![www.fox13now.com](https://ewscripps.brightspotcdn.com/dims4/default/ccff394/2147483647/strip/true/crop/1920x1008+0+36/resize/1200x630!/quality/90/?url=https%3A%2F%2Fx-default-stgec.uplynk.com%2Fausw%2Fslices%2Fbde%2Fef205c0e5ea14d77944cbd6904335118%2Fbde1f522db954a9aadea126c6cbd2059%2Fposter_7caeeecd0ed2422fa11e7fb8c5a23fd1.jpeg)
One of Snowbird's brand new tram cabins damaged beyond repair during installation
The installation of two brand-new, state-of-the-art tram cabins at Snowbird is not quite going as planned.