More like if they move forward on the quad install now, it will be this winter. They need to move because I doubt they can pour footings after the ground freezes up. Without a firm stated open target, I doubt they reopen this winter. Too much to do and if they intend to open with just a refurbished T-bar their terrain will be constricted with the work happening on the new quad. We've waited this long, guess we can wait one more winter.Very odd. I had thought they had an order with Dopp for a new t-bar with drastically increased capacity. Also not a ton of information in that post. Will they be delayed by mother nature because of getting too cold too early and not being able to install the lifts? I'd assume so, but why not say that. Additionally, will they be installing the new rangeley quad this fall?