The last picture has what could be the motor room on top of the guide rails. You would have to run high current electrical service to the top, to drive it from there. The fixed grip quad "B" lift had power at the top because of it's vicinity to "F" lift.
 

kartski

New member
Joined
Dec 26, 2009
Messages
97
Points
0
Location
Newburgh, NY.
Mechanical Engineering isn't my specialty, what's the advantage to locating the drive up top. I know I feel uneasy when I see Mountain Staff and Central Hudson poking around the Electrical Service by the base. I did read recently there was 5 mil in a low interest USDA back loan for this. They might justify moving high current lines to the top if the quads drive is also going to the top. They wouldn't need any at the base of the West Side once Z and Y are out. The service at the summit right now just has to operate the furnace, lights, concession stand and the emergency radio relay equipment kept up there for local EMS.
 

180

Well-known member
Joined
Oct 29, 2004
Messages
1,959
Points
48
Location
mahopac, ny
It is more efficient to have the drive at the top because it only has to pull the main weight up. With the motor at the bottom it has to pull the weight up and down.
 

catskillman

Well-known member
Joined
Aug 6, 2009
Messages
1,238
Points
48
And why is the old terminal still at the bottom,pratically on top of the new terminal???

Interesting rumers/comments heard yesterday -

1. Keeping it there in case the new moter does not work - they can use the old very reliable one. This has got to be false, can't imagine this is true, but what do I know.

2. Mgt is irrated at the Zipline group, and the new zip from the top is supposed to end there. Again, can't imagine this logistically but....
 

millerm277

Well-known member
Joined
Nov 18, 2006
Messages
1,828
Points
48
Location
NH
Maybe they aren't moving it until they're ready to install it on the other side next year?
 

bvibert

Moderator
Staff member
Moderator
Joined
Aug 30, 2004
Messages
30,394
Points
38
Location
Torrington, CT
Maybe they aren't moving it until they're ready to install it on the other side next year?

That's my guess. I bet it will stay put until they have the footings and what not ready to accept it in it's new location. I does look pretty stupid though...
 

catskillman

Well-known member
Joined
Aug 6, 2009
Messages
1,238
Points
48
agree - and it is so close to the new lift base, it would be very risky to remove it with a helicopter as it might hit the new base.

Something's not right ---
 

dmc

New member
Joined
Oct 28, 2004
Messages
14,275
Points
0
Choppers are supposedly showing up today..
 

catskills

Active member
Joined
Dec 26, 2004
Messages
1,345
Points
38
If its pasts the load test maybe they will open it up for the leaf peepers.
 