machski
Well-known member
Again, this is the supposed all in project cost. I believe the bottom terminal is being re located so there may be a lot of earth work at the base depending on where the terminal will actually sit. I just looked through the post construction plans, there is no midstation in those plans. Appears it will be a top drive with full backup.Holy crap! LiftBlog reporting Dopp will be building the replacement lift for the Snowdon Triple and total project cost to $7.04 Million! I hope there is a lot of land work in that cost, I mean it's a Fixed Grip chair going in!!