They also have been like manually feeding every NRX chair thru the detachable transition in the load station l. The infrastructure is problematic.
Yup...I noticed that too. That chain drive system in the terminal is problematic. I feel like I remember trailboss pointing out this as a potential (or past) issue with NRX several years ago as well.