KevinF
Member
I believe a lot of the cosmetic changes to Liftline and trails like Goat were done when the ForeRunner Quad was put in around 1986. There may have been some small changes since then. I'll admit I am not a big Stowe guy so I am sure there is someone out there with better knowledge than me.
I'll have to ask the next time I'm up at Stowe; I know a few people there that might know some of the trail history.
According to www.chairlift.org, the double at Stowe was installed in 1960 to supplement the single. They have this picture:

It looks about the same width, or at least it's certainly not "narrow". Maybe they did a lot of changes then to accommodate the second chairlift over the same trail.