doublediamond
Active member
- Joined
- Dec 22, 2013
- Messages
- 519
- Points
- 43
Snow control isn’t about if they have enough on the ground on that date. It‘s is there enough now with the forecasted snowmaking production over the coming 10(?) days.
Killington has never failed snow control.
Killington has never failed snow control.