polski
New member
Really sensible plan. Snow making, get the third lift built, Magic Carpet, and fix the Black and Red chairs. Everything else comes later.
Curious why the third lift ranks that high up the priority list. I've only been there twice so may well be missing something. Agreed on snowmaking being #1 (being more southerly and lower elevation, they can't get away with relying mainly on natural snowfall the way MRG usually can), and obviously the two existing lifts have to be dependable. But is additional uphill capacity a critical need, at least initially?