doublediamond
Active member
- Joined
- Dec 22, 2013
- Messages
- 546
- Points
- 43
Regarding the highspeed lift, i hear they don't have room at the top for all the offloading. Is this true.
Where? Top of 1/1A or 4? They've said both were getting a HSQ at one time or another.
1/1A has plenty of unloading room and downhill capacity. Heck, 1/1A could have been replaced with a HS6.
4 was "planned" to be replaced with a base-to-top HSQ that went further up to the summit of Virgil Mtn. The proposed lift and trails was even on maps. It would feed the current trails off 4 and 2 additional trails towards the bottom of 5. This was one gigantic joke. They would have put in a summit lodge. The 3 routes to the top of current trails would be only about 5% downhill (read: massive skating/poling/hoofing for boarders). They would have to run 5 daily (won't, too pennywise). And it was to be base-to-top and with the powerlines, it'd need to start in the middle of the bunny slope about where 3 loads today. AND to top it off, they'd need to either close Lower Zeus, sending all HSQ traffic funneling down Poseidon through the bunny slope unless they built a new trail from the base of current 4 through their boneyard to the base of the proposed HSQ.
I think the idea was to increase skier traffic using 4. Trojan is my favorite. But no one will ski Trojan with the runout. And you can't attract experts with the fact that Zeus hasn't seen snowmaking in 5 or so years, and Hercules gets it in all but the worst winters (but is the last to get hit and not until late Jan). And even when Zeus did get snowmaking, they wouldn't do it on lower Zeus. Marathon is a skate/pole fest and upper Mars Hill is flatter than a pancake. So no beginners.
So basically, excluding sufficient natural to open things, they run 4 for the purpose of serving Trojan for 2 months (if that) and Trojan and Hercules (Hercules only open days only) for 2 more months (if that), and access to 5 when it runs.
4 is also a dump and falling apart. One of the towers shakes at the breakover above the headwall every time a chair passes it, and the footrests break off if you look at them funny. And on startup the jerk is so bad it practically throws you off. Probably the worst Hall ever built.
They should bring back Electra under the power lines to provide an additional intermediate route down. And they should cut a better beginner route down. Leave Mars Hill where it flattens and where the trees change from deciduous to pine (about 1/3 of the way from the power line to the bend) and cut a new route towards upper Poseidon. Hercules, Electra, and the new green should all get lights and their own pipes too.
Last edited: