bdfreetuna
New member
Don't the triple and quad already have the capacity of a six pack.
Not really because they are very slow lifts.
I thought the Quad was going to stay and just the Triple replaced with the 6-pack anyway?
Welcome to AlpineZone, the largest online community of skiers and snowboarders in the Northeast!
You may have to REGISTER before you can post. Registering is FREE, gets rid of the majority of advertisements, and lets you participate in giveaways and other AlpineZone events!
Don't the triple and quad already have the capacity of a six pack.
Not really because they are very slow lifts.
I thought the Quad was going to stay and just the Triple replaced with the 6-pack anyway?
Not really because they are very slow lifts.
I thought the Quad was going to stay and just the Triple replaced with the 6-pack anyway?
chair potential capacity (assuming a chair doesn't stop for an hour straight....) is really pretty easy. Most lifts load (and therefore unload) at 6 to 9 second intervals...
if you've got a quad, regardless of if its a highspeed or fixed grip, with 6 second chair spacing (the common spacing for many lifts) it's going to move 2400 people an hour up the mountain. The only thing that a highspeed does is shorten the ride time, not increase the capacity.
With industry standard 6 second spacing, a single's capacity would be 600 and hour, a double 1200 an hour, a triple 1800 an hour, a quad 2400 an hour and a 6 pack 3600 an hour. Often with 6 packs, the spacing is increased to 8 or 9 seconds to give the extra people on each chair more time to load and unload with the theory being more people on a chair ='s more chances of chaos loading or unloading....
So the 3000 people per hour on K's new bubble 6 pack translates into a chair loading/unloading every 8.33 seconds
It seems like all our calculations so far have assumed that the triple and current snowdon quad were at capacity. This usually isn't the case. While the Snowdon quad can have a line on weekends, the triple usually only has 2 people on most chairs.
I think we will be seeing an increase in people on Snowdon with the new lift, simply from the fact that the new lift is a destination lift or iconic lift--something like a gondola that attracts the non hardcore crowd. I honestly would have thought that a 6 person bubble lift would be more likely on ramshead first.
And personally I'm fine with that. I never really liked snowdon anyway. I skied it too much during early season and hate the "wipeout zone" (aka the intersection of Chute, Mousetrap, Great Northern).
I honestly would have thought that a 6 person bubble lift would be more likely on ramshead first.
If Ram's Head ever gets a new lift I would really hope they put it back to the top of the mountain. Kind of a shame those short steep trails aren't on the map anymore.
It has become their primary "harder green / easier blue" type of trails... the first place people go after the advance from snowshed. I can't imagine they bring back the steeper parts at the top.
It has become their primary "harder green / easier blue" type of trails... the first place people go after the advance from snowshed. I can't imagine they bring back the steeper parts at the top.
I thought one of the reasons they lowered the top of the Ramshead lift was due to wind as well (I vaguely recall reading that in the book on Killington's history). But now with it becoming such a key beginner area, I can't see them adding the top back in for that reason either.