This outreach is to share information on a proposed building project at Jay Peak Resort. This
project is proposed to install a new 6-passenger chair lift we are calling “Power Line Lift”. The
proposed construction for this season consists of installing the lift structure and equipment, site
grading in the loading and unloading areas, a storage building for the detachable chairs, and
building lift attendant huts at the top and bottom terminals. Detailed plans of the proposed
construction are available at the Jay Town Clerk’s office for your review, along with building
plans and permit applications. We have attached a map of the proposed project location for your
review.
The Power Line Lift project will be discussed at a Town of Jay Zoning Board meeting on
February 11, 2013 at 7:15pm.
This outreach is to share information on a proposed building project at Jay Peak Resort. This
project is proposed to install a new 6-passenger chair lift we are calling “Power Line Lift”. The
proposed construction for this season consists of installing the lift structure and equipment, site
grading in the loading and unloading areas, a storage building for the detachable chairs, and
building lift attendant huts at the top and bottom terminals. Detailed plans of the proposed
construction are available at the Jay Town Clerk’s office for your review, along with building
plans and permit applications. We have attached a map of the proposed project location for your
review.
The Power Line Lift project will be discussed at a Town of Jay Zoning Board meeting on
February 11, 2013 at 7:15pm.